That’s assuming this county grows faster than current projections, and assuming prosecutors finally decide what to do about this $25 million question. “People can argue if they want to, but when they run out of water they’re going to quit arguing.” He knew how to do it.”Īccording to Tolley, the real costly mistake was firing Tommy Craig. The new cost for a residential sewer meter will be 3,650, an increase of 50. “I don’t think it was a conflict of interest,” said Tolley. The new fee for a 1-inch residential water meter will be 3,082, an increase of 172. He said Craig won government approval for other reservoirs across the state and was a leading expert in the field. Tolley said the 71-year-old Craig is recovering from cancer and unable to defend himself publicly. Every piece of property that was purchased was done with the approval of the sitting county commission.” “In fact, that’s a ridiculous allegation. Project highlights included Dutchland precast structure installation, GEFA funding program management, and value engineering construction cost reduction of $8 million.Some of the land bought for the proposed reservoir had to be returned to the original owners for free.Ĭraig’s attorney Ed Tolley denied his client broke any laws. Throughout Phase I construction, our project team provided Resident Project Representative (RPR) services that included providing project management and coordination, reviewing submittals and shop drawings, reviewing RFIs and issuing clarifications, witnessing applicable testing, providing daily on-site observation, reviewing monthly pay requests, attending weekly progress meetings, and providing aerial drone services. Fitch Upgrades Athens-Clarke County Unified Gov, GAs Water and Sewer Revs to AAA Outlook Stable. Douglasville-Douglas County Water and Sewer Authority 8763 Hospital Drive Douglasville, GA 30134 Phone: (770) 949-7617 Fax: (678) 631-1515 Email: APPLICATION FOR WATER AND/OR SEWER SERVICE Name: Social Security No./Tax ID No.: Mailing Address. GWES was contracted as the project engineering consultant. Scott Emmons Water Reclamation Facility at the Littler River. The Authority contracted with Reeves Young for CMAR to construct the 1.25 MGD A. The engineering design phase was completed in January of 2019 and the Authority was approved for a $25 million GEFA loan in February 2019. GWES’ scope included the preparation and submission of a LOI to EPD, re-application for Waste Load Allocation, reviewing and updating the Anti-Degradation Report, Environmental Impact Document, Design Development Report, Equipment Matrix, existing project drawings and specifications, and Hydrology Study, developing an opinion of probable construction cost, submitting the Environmental Review and Planning Document to GEFA, submitting plans and specifications to EPD for Review, and preparing bid set documents for the Construction Manager at Risk (CMAR) bid solicitation. The target permitted capacity for the updated plans and specifications was 1.25 MGD. The Newton County Water and Sewerage Authority (the Authority) requested engineering services to review and update previously completed (2010) plans and specifications as necessary for permitting by the Georgia Environmental Protection Division, and ultimately in preparation for advertisement and bidding. Join to view profile Newton County Water & Sewerage Authority. Casey Piper – Regulatory Compliance/Resident Project RepresentativeĬLIENT: Newton County Water & Sewerage Authority Executive Director at Newton County Water & Sewerage Authority Covington, Georgia, United States.Barrett Neal – Assistant Project Manager.Environmental Permitting & GEFA Coordination.Design Update (Plans and Specifications).
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |